Insights
Writing for people who chose our services.
Specification
Heat pump electrical provision: what to specify early
What a heat pump needs from the electrical design — supply capacity, DNO notification, a dedicated circuit, controls wiring and metering — decided early.
Read →Process
Pre-handover electrical checks: a summer site list
Electrical checks to make before practical completion — certification, smart-system commissioning, fault testing and the snags that surface in summer.
Read →Specification
What architects should specify at Stage 3 for smart lighting
KNX, Rako, Lutron and Control4 compared on what actually decides a project — scene latency, dimming protocols, AV integration and spec language.
Read →Process
Your electrical contractor and the RIBA Plan of Work
Where to bring us in, what to ask for at each stage, and how to keep the lighting and control conversation off your critical path.
Read →Heritage
Electrical scope on Grade II listed buildings
Concealed routing, reversible fixings, Listed Building Consent considerations, and the documentation that keeps conservation officers comfortable.
Read →